Precast Concrete Bridge Construction Projects
Design and fabrication of various types of bridge elements. These include precast box and arch culverts, abutment walls and foundations, wing walls and parapets. Unique solutions are also designed the incorporate a blend of engineering and production techniques.
Review the example projects listed below:
​
Oldmans Creek Road Bridge Reconstruction
​
Oldmans Creek Road Bridge Reconstruction
Garden State Precast Project #:# 19-48967
Project Name: BRIDGE 5-B-5 RECON - OLDMANS CREEK RD
Location:: Woolwich Township, NJ
Project start date: September 17, 2019
Project end date: May 2020
​
Synopsis of Development:
Design, and fabrication of a modified arch bridge in (6) sections. Design and fabrication of matching precast headwalls (2) and wing wall sections (11).
​
Technical challenges and project constraints:
-
Match existing HEC 3 design cross section
-
Design modified bin wall/deadmen wing wall anchors
-
Design and outsource fabrication of specialty formwork
-
Overhead electrical wires reduced available area for crane set up, section weight was restricted
-
Development of shipping, rigging and handling for odd shaped units.
​​
Fabrication and Testing Activities:
-
Development of Safety protocol for wing wall fabrication with new bin wall/deadmen anchors
-
Development of supports for bin wall/deadmen anchors
-
Test fitting of all sections in yard prior to shipment
-
Change in fabrication due to Covid-19 pandemic.
-
Modeling bin wall/deadmen anchor system for use on projects on a national level.
​​
Fabrication
-
Production commenced on 3-5-20 and completed on 4-27-20
Crusers Brook Bridge Project
Garden State Precast Project #: 17-42643
Project Name: NJ ROUTE 206 CRUSERS BROOK BRIDGE DP 17102
Location: HILLSBOROUGH TWP NJ
Project start date: NOVEMBER 2018
Project end date: SPRING 2019
​
Synopsis of Development:
This is a design-build project that Garden State Precast participated in during a four-year period. The project consisted of twenty-four, large, three-sided frames in a dual run configuration. GSP was involved in the design, production and shipment of the units.
​
Design Challenges and Project Constraints:
This project was designed and deployed over a four-year period. Challenges included project geometry, barrier HL4 ratings, phase construction, special high-strength concrete, shipment to project site, rigging and handling for a 90 degree roll from form to shipment then another 90 degree roll from shipment to installation. All units also required manufacturing on a 30 degree skew.
Fabrication and Testing Activities:
-
Design, purchase of specific formwork, and production of (24) 33’ x 11’-2 frames
-
Validation on NJDOT Class P2 concrete – 6500 psi.